Waste rock dumping optimisation using mixed integer programming (MIP)
Despite the fact that waste rock hauling and dumping comprises a large proportion of the cost of materials handling in an open pit mine, little detailed planning is devoted to optimising waste rock dumping. The lack of such planning could result in long-term exposure of potential acid forming (PAF)...
| Main Authors: | Li, Yu, Topal, Erkan, Williams, David |
|---|---|
| Format: | Journal Article |
| Published: |
Taylor & Francis
2013
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/20.500.11937/13410 |
Similar Items
Optimisation of a Mixed Truck Fleet Schedule through a MIP Model Considering a New Truck-Purchase Option
by: Fu, Z., et al.
Published: (2014)
by: Fu, Z., et al.
Published: (2014)
The Application of a MIP Model to Select the Optimum Auxiliary Fan and Operational Settings for Multiple Period Duties
by: Acunna, E., et al.
Published: (2010)
by: Acunna, E., et al.
Published: (2010)
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012)
by: Nehring, M., et al.
Published: (2012)
Performance of different treatment media for passive remediation of contaminants associated with acid mine drainage
by: Madzin, Zafira
Published: (2018)
by: Madzin, Zafira
Published: (2018)
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)
by: Little, J, et al.
Published: (2013)
Passive remediation for metal-rich mine water using steel slag
by: Md Zahar, Mohd Syakirin
Published: (2017)
by: Md Zahar, Mohd Syakirin
Published: (2017)
Mining value-based item packages - An integer programming approach
by: Achuthan, Narasimaha, et al.
Published: (2006)
by: Achuthan, Narasimaha, et al.
Published: (2006)
Exploiting structure in integer programs
by: Mareček, Jakub
Published: (2012)
by: Mareček, Jakub
Published: (2012)
Impact of free trade agreements and anti-dumping on Malaysian trade flows
by: Said, Rashidi
Published: (2018)
by: Said, Rashidi
Published: (2018)
A simulation scenario based mixed integer programming approach to airline reserve crew scheduling under uncertainty
by: Bayliss, Christopher D., et al.
Published: (2016)
by: Bayliss, Christopher D., et al.
Published: (2016)
A simulation scenario based mixed integer programming approach to airline reserve crew scheduling under uncertainty
by: Bayliss, Christopher D., et al.
Published: (2014)
by: Bayliss, Christopher D., et al.
Published: (2014)
Optimum waste dump planning using Mixed Integer Programming (MIP)
by: Li, Yu
Published: (2014)
by: Li, Yu
Published: (2014)
A new MIP model for mine equipment scheduling by minimizing maintenance cost
by: Topal, Erkan, et al.
Published: (2010)
by: Topal, Erkan, et al.
Published: (2010)
Mixed integer programming with decomposition to solve a workforce scheduling and routing problem
by: Laesanklang, Wasakorn, et al.
Published: (2015)
by: Laesanklang, Wasakorn, et al.
Published: (2015)
An exact penalty function method for nonlinear mixed discrete programming problems
by: Changjun, Y., et al.
Published: (2013)
by: Changjun, Y., et al.
Published: (2013)
Decomposition techniques with mixed integer programming and heuristics for home healthcare planning
by: Laesanklang, Wasakorn, et al.
Published: (2017)
by: Laesanklang, Wasakorn, et al.
Published: (2017)
A study of optimisation methods applied to methane recovery and mine ventilation systems
by: Moll, A.T.J.
Published: (1993)
by: Moll, A.T.J.
Published: (1993)
Optimal timetable synchronization for greater Kuala Lumpur using mixed integer programming / Saiyidatul Adidah Idris
by: Idris, Saiyidatul Adidah
Published: (2020)
by: Idris, Saiyidatul Adidah
Published: (2020)
Mixed integer programming with decomposition for workforce scheduling and routing with time-dependent activities constraints
by: Laesanklang, Wasakorn, et al.
Published: (2016)
by: Laesanklang, Wasakorn, et al.
Published: (2016)
Optimisation of waste rock placement using mixed integer programming
by: Li, Y., et al.
Published: (2014)
by: Li, Y., et al.
Published: (2014)
Least squares prediction in linear models with integer unknowns.
by: Teunissen, Peter.
Published: (2007)
by: Teunissen, Peter.
Published: (2007)
Bioassay assessment of mine pit lake water for aquaculture and biodiversity conservation
by: Neil, Luke L
Published: (2007)
by: Neil, Luke L
Published: (2007)
A review of soft computing technology applications in several mining problems
by: Jang, H., et al.
Published: (2014)
by: Jang, H., et al.
Published: (2014)
Mixed integer programming model for scheduling in unrelated parallel processor system with priority consideration
by: Caccetta, Louis, et al.
Published: (2014)
by: Caccetta, Louis, et al.
Published: (2014)
The influence of rock mass and intact rock properties on the design of surface mines with particular reference to the excavatability of rock
by: Kramadibrata, Suseno
Published: (1996)
by: Kramadibrata, Suseno
Published: (1996)
Corrosion of rock reinforcement in underground excavations
by: Hassell, Rhett Colin
Published: (2008)
by: Hassell, Rhett Colin
Published: (2008)
Optimizing tree planting areas through integer programming and improved genetic algorithm
by: Md Badarudin, Ismadi
Published: (2012)
by: Md Badarudin, Ismadi
Published: (2012)
The recovery of nucleic acid from biomining and acid mine drainage microorganisms
by: Zammit, Carla, et al.
Published: (2011)
by: Zammit, Carla, et al.
Published: (2011)
Mineralogical, numerical and analytical studies of the coupled oxidation of pyrite and coal
by: Evans, Katy, et al.
Published: (2003)
by: Evans, Katy, et al.
Published: (2003)
Task rescheduling model for resource disruption problem in unrelated parallel processor system
by: Nordin, Syarifah, et al.
Published: (2014)
by: Nordin, Syarifah, et al.
Published: (2014)
Framework for stream clustering of trajectories based on temporal micro clustering technique
by: Abdulrazzaq, Musaab Riyadh
Published: (2018)
by: Abdulrazzaq, Musaab Riyadh
Published: (2018)
Office space allocation by using mathematical programming and meta-heuristics
by: Ulker, Ozgur
Published: (2013)
by: Ulker, Ozgur
Published: (2013)
Maximum likelihood estimation in mixed integer linear model with P-norm distribution
by: Li, Bofeng, et al.
Published: (2010)
by: Li, Bofeng, et al.
Published: (2010)
Mathematical approach for better mine waste rock dumping management
by: Li, Y., et al.
Published: (2012)
by: Li, Y., et al.
Published: (2012)
Dissolution of lead- and lead-arsenic-jarosites at pH 2 and 8 and 20 C: Insights from batch experiments
by: Wright, Kathleen, et al.
Published: (2006)
by: Wright, Kathleen, et al.
Published: (2006)
Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming
by: Li, Y, et al.
Published: (2014)
by: Li, Y, et al.
Published: (2014)
Soft clustering-based scenario bundling for a progressive hedging heuristic in stochastic service network design
by: Jiang, Xiaoping, et al.
Published: (2020)
by: Jiang, Xiaoping, et al.
Published: (2020)
MILP model for resource disruption in parallel processor system
by: Nordin, Syarifah, et al.
Published: (2015)
by: Nordin, Syarifah, et al.
Published: (2015)
On the integer normal distribution of the GPS ambiguities.
by: Teunissen, Peter
Published: (1998)
by: Teunissen, Peter
Published: (1998)
On the computation of the best integer equivariant estimator
by: Teunissen, Peter
Published: (2005)
by: Teunissen, Peter
Published: (2005)
Similar Items
-
Optimisation of a Mixed Truck Fleet Schedule through a MIP Model Considering a New Truck-Purchase Option
by: Fu, Z., et al.
Published: (2014) -
The Application of a MIP Model to Select the Optimum Auxiliary Fan and Operational Settings for Multiple Period Duties
by: Acunna, E., et al.
Published: (2010) -
Integrated short and medium term underground mine production scheduling
by: Nehring, M., et al.
Published: (2012) -
Performance of different treatment media for passive remediation of contaminants associated with acid mine drainage
by: Madzin, Zafira
Published: (2018) -
Integrated Optimization of Underground Mine Design and Scheduling
by: Little, J, et al.
Published: (2013)