Evaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansion
Wear of cutting tools and other components of the pressurized face tunnel boring machine which come in contact with the muck is an important parameter in soft ground tunneling. This is due to the need for cutterhead inspection and tool maintenance under pressurized conditions or “hyperbaric interven...
| Main Authors: | Amoun, S., Sharifzadeh, Mostafa, Shahriar, K., Rostami, J., Tarigh Azali, S. |
|---|---|
| Format: | Journal Article |
| Published: |
Pergamon
2017
|
| Online Access: | http://hdl.handle.net/20.500.11937/12771 |
Similar Items
EPB-TBM Tunneling in Abrasive Soil Tehran Metro Tunnel Line 7, Iran
by: Amoun, S., et al.
Published: (2015)
by: Amoun, S., et al.
Published: (2015)
Soil abrasiveness for EPB-TBM along Tehran metro tunnel line 7, Iran
by: Amoun, S., et al.
Published: (2015)
by: Amoun, S., et al.
Published: (2015)
Determining radius of influence of the face in EPB shield tunneling by finite difference method
by: Sharifzadeh, Mostafa, et al.
by: Sharifzadeh, Mostafa, et al.
A study of unusual TBM disk cutters wears in Karaj-Tehran water conveyance tunnel
by: Farokhnia, M., et al.
Published: (2008)
by: Farokhnia, M., et al.
Published: (2008)
Effects of round length and excavation phases in the NATM induced surface settlement: Line 4 of Tehran metro
by: Sharifzadeh, Mostafa, et al.
Published: (2010)
by: Sharifzadeh, Mostafa, et al.
Published: (2010)
Interaction of twin tunnels and shallow foundation at Zand underpass, Shiraz metro, Iran
by: Afifipour, M., et al.
Published: (2011)
by: Afifipour, M., et al.
Published: (2011)
An Investigation on Interaction of twin tunnels and Zand underpass Using Relative stiffness method-Shiraz metro
by: Afifipour, M., et al.
Published: (2010)
by: Afifipour, M., et al.
Published: (2010)
Evaluation of Building Displacement Induced By EPB Tunneling Through GPS-GNSS Monitoring System and Back Analysis Technique (Tabriz Subway Twin Tunnels)
by: Davarpanah, S., et al.
Published: (2016)
by: Davarpanah, S., et al.
Published: (2016)
Application of observational method in conventional tunnelling projects in urban areas- the case of Niayesh road tunnel project, Tehran, Iran
by: Ghorbani, M., et al.
Published: (2011)
by: Ghorbani, M., et al.
Published: (2011)
Numerical study the effect of the ratio of distance between the center the central axis of the tunnel and center of structures to tunnel’s diameter parameter on the interaction of the tunnel-surface structures, Case Study- Niayesh Tunnel, Tehran
by: Sharifzadeh, Mostafa, et al.
by: Sharifzadeh, Mostafa, et al.
Design Optimization In A Conventional Tunnelling Project In Urban Area Using The Observational Method- Niayesh Road Tunnel In Tehran, Iran
by: Sharifzadeh, Mostafa, et al.
Published: (2014)
by: Sharifzadeh, Mostafa, et al.
Published: (2014)
Estimation of Rock Load for Tunnels Excavated in Different Rock Masses
by: Afshar, T., et al.
Published: (2014)
by: Afshar, T., et al.
Published: (2014)
Numerical study of the behaviour of jointed tunnel lining
by: Barzegar, M., et al.
Published: (2015)
by: Barzegar, M., et al.
Published: (2015)
Long-term stability analysis of tunnel lining in weak rocks using data from tunnelling construction
by: Sharifzadeh, Mostafa, et al.
Published: (2014)
by: Sharifzadeh, Mostafa, et al.
Published: (2014)
Construction regulations along metro alignment
by: Ghiasi, Vahed, et al.
Published: (2010)
by: Ghiasi, Vahed, et al.
Published: (2010)
Tunnel Probabilistic Structural Analysis Using the FORM
by: Sharifzadeh, Mostafa, et al.
Published: (2015)
by: Sharifzadeh, Mostafa, et al.
Published: (2015)
Evaluation of rock mass engineering geological properties using statistical analysis and selecting proper tunnel design approach in Qazvin–Rasht railway tunnel
by: Rahimi, B., et al.
Published: (2014)
by: Rahimi, B., et al.
Published: (2014)
The Role of Constitutive Model Selection on Tunnel Induced Subsidence in Urban Area
by: Sayadi, S., et al.
Published: (2015)
by: Sayadi, S., et al.
Published: (2015)
Prediction of Squeezing zones in Ghomroud tunnel and appropriate measures for hazards mitigation
by: Sharifzadeh, Mostafa, et al.
Published: (2008)
by: Sharifzadeh, Mostafa, et al.
Published: (2008)
Evaluation of tunnel instability in layered structures using physical modelling
by: Mousaei, N., et al.
Published: (2015)
by: Mousaei, N., et al.
Published: (2015)
Geotechnical risks analysis in water transfer tunnel of the Kerman – Iran
by: Arabnejad, H., et al.
Published: (2010)
by: Arabnejad, H., et al.
Published: (2010)
Time-dependent behavior of tunnel lining in weak rock mass based on displacement back analysis method
by: Sharifzadeh, Mostafa, et al.
Published: (2013)
by: Sharifzadeh, Mostafa, et al.
Published: (2013)
Hydromechanical analysis of the effect of fracture properties on tunnel inflow
by: Sharifzadeh, Mostafa, et al.
Published: (2007)
by: Sharifzadeh, Mostafa, et al.
Published: (2007)
Strength of Harian Metro tabloid as advertising media to the Al-Ikhsan business expansion in Bangsar / Muhammad Shukri Shukor
Published: (2007)
Published: (2007)
TBM Tunneling in adverse rock mass with emphasis on the TBM Jamming accident in Ghomrud water transfer tunnel
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
Effect of squeezing on support pressure - Golab tunnel
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
Risk analysis for determination of tunnel support pattern- A Case study in Taloun road tunnel
by: Sharifzadeh, Mostafa, et al.
Published: (2007)
by: Sharifzadeh, Mostafa, et al.
Published: (2007)
Numerical analysis of the effect of fracture normal and shear stiffness on inflow into tunnel
by: Sharifzadeh, Mostafa, et al.
Published: (2007)
by: Sharifzadeh, Mostafa, et al.
Published: (2007)
Effect of building’s geometrical Factors on the interaction of the tunnel-surface structures, the case of Niayesh Tunnel in Iran
by: Sharifzadeh, Mostafa, et al.
Published: (2015)
by: Sharifzadeh, Mostafa, et al.
Published: (2015)
Design of sequential excavation method for large span urban tunnels in soft ground – Niayesh tunnel
by: Sharifzadeh, Mostafa, et al.
Published: (2013)
by: Sharifzadeh, Mostafa, et al.
Published: (2013)
Point Estimate Method in Risk Analysis for Tunnel Support System Selection: A Case Study in Taloun Road Tunnel
by: Sheikhi, H., et al.
Published: (2008)
by: Sheikhi, H., et al.
Published: (2008)
Geotechnical, structural and geodetic measurements for conventional tunnelling hazards in urban areas – The case of Niayesh road tunnel project
by: Ghorbani, M., et al.
Published: (2012)
by: Ghorbani, M., et al.
Published: (2012)
Hydraulic-Hydromechanical Analysis Of Rock Masses Around Tunnel Using Distinct Element Method
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
Effect of educational intervention on the intention to provide family-centered care among selected hospitals’ paediatric nurses in Tehran, Iran
by: Rostami, Forouzan
Published: (2015)
by: Rostami, Forouzan
Published: (2015)
Fighting rat menace in Sunway Metro
by: New Straits Times, Dawn Chan
Published: (2012)
by: New Straits Times, Dawn Chan
Published: (2012)
General Idea for Study of Rock Mass Variability Respect to Depth (Freeway Tunnels of Khorramabad–Polezal)
by: Moosavi, S., et al.
Published: (2010)
by: Moosavi, S., et al.
Published: (2010)
Difficulties in TBM Tunneling in adverse rock mass with Case study (Ghomrud water transfer tunnel)
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
by: Sharifzadeh, Mostafa, et al.
Published: (2006)
Multivariate Estimation of Rock Mass Characteristics Respect to Depth Using ANFIS Based Subtractive Clustering-Khorramabad-Polezal Freeway Tunnels
by: Sharifzadeh, Mostafa
Published: (2017)
by: Sharifzadeh, Mostafa
Published: (2017)
Assessment The Influence Of Building's Geometry And Weight On Surface Settlement Induced By Tunneling Using a Numerical Finite Element Method – The Case Of Niayesh Tunnel Project
by: Sharifzadeh, Mostafa, et al.
Published: (2011)
by: Sharifzadeh, Mostafa, et al.
Published: (2011)
The Role of Geological Structures to Tunnel Inflow, Modelling Strategies and Predictions
by: Sharifzadeh, Mostafa, et al.
by: Sharifzadeh, Mostafa, et al.
Similar Items
-
EPB-TBM Tunneling in Abrasive Soil Tehran Metro Tunnel Line 7, Iran
by: Amoun, S., et al.
Published: (2015) -
Soil abrasiveness for EPB-TBM along Tehran metro tunnel line 7, Iran
by: Amoun, S., et al.
Published: (2015) -
Determining radius of influence of the face in EPB shield tunneling by finite difference method
by: Sharifzadeh, Mostafa, et al. -
A study of unusual TBM disk cutters wears in Karaj-Tehran water conveyance tunnel
by: Farokhnia, M., et al.
Published: (2008) -
Effects of round length and excavation phases in the NATM induced surface settlement: Line 4 of Tehran metro
by: Sharifzadeh, Mostafa, et al.
Published: (2010)