Optimising the long-term mine waste management and truck schedule in a largescale open pit mine

A mine landform progression plan can provide a clear outlook of the entire mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or tonnage) and the allocated dumping location. However, current practices mainly focus on the ore...

Full description

Bibliographic Details
Main Authors: Li, Y., Topal, Erkan, Ramazan, S.
Format: Journal Article
Published: 2016
Online Access:http://hdl.handle.net/20.500.11937/12250
_version_ 1848748025543917568
author Li, Y.
Topal, Erkan
Ramazan, S.
author_facet Li, Y.
Topal, Erkan
Ramazan, S.
author_sort Li, Y.
building Curtin Institutional Repository
collection Online Access
description A mine landform progression plan can provide a clear outlook of the entire mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or tonnage) and the allocated dumping location. However, current practices mainly focus on the ore production, over-simplifying the waste material scheduling. As a result, a rock dump is often treated as a single point in long-term planning, making it difficult to predict the progression pattern over the life of mine. Without such a guidance, it is almost impossible to carry out progressively rehabilitate of the waste rock dumps. The lack of detailed waste material dumping schedule could cause delay in development construction, i.e. tailing storage facility and Run of Mine-pad. Other downstream effect due to the over-simplification is an inaccurate estimation of required truck, which could have huge financial impact on the operation. In this paper, mixed integer programming models of different objective functions, i.e. maximise truck productivity by minimising the overall haulage distance, minimise required truck deviation between adjacent years, and a hybrid between the two objectives, are utilised to generate the long-term optimum rock placement schedules under the condition of satisfying sitespecific requirements. All three models are implemented in a large-scale open pit mine. The numerical solutions from the models form three different schedules of mined material placement, based on which, the yearly truck requirements are easily calculated and compared. The graphical results show the three corresponding landform progression patterns over the life of mine, providing the optimised long-term forecast of the operation.
first_indexed 2025-11-14T06:58:29Z
format Journal Article
id curtin-20.500.11937-12250
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T06:58:29Z
publishDate 2016
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-122502017-09-13T14:56:51Z Optimising the long-term mine waste management and truck schedule in a largescale open pit mine Li, Y. Topal, Erkan Ramazan, S. A mine landform progression plan can provide a clear outlook of the entire mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or tonnage) and the allocated dumping location. However, current practices mainly focus on the ore production, over-simplifying the waste material scheduling. As a result, a rock dump is often treated as a single point in long-term planning, making it difficult to predict the progression pattern over the life of mine. Without such a guidance, it is almost impossible to carry out progressively rehabilitate of the waste rock dumps. The lack of detailed waste material dumping schedule could cause delay in development construction, i.e. tailing storage facility and Run of Mine-pad. Other downstream effect due to the over-simplification is an inaccurate estimation of required truck, which could have huge financial impact on the operation. In this paper, mixed integer programming models of different objective functions, i.e. maximise truck productivity by minimising the overall haulage distance, minimise required truck deviation between adjacent years, and a hybrid between the two objectives, are utilised to generate the long-term optimum rock placement schedules under the condition of satisfying sitespecific requirements. All three models are implemented in a large-scale open pit mine. The numerical solutions from the models form three different schedules of mined material placement, based on which, the yearly truck requirements are easily calculated and compared. The graphical results show the three corresponding landform progression patterns over the life of mine, providing the optimised long-term forecast of the operation. 2016 Journal Article http://hdl.handle.net/20.500.11937/12250 10.1080/14749009.2015.1107343 restricted
spellingShingle Li, Y.
Topal, Erkan
Ramazan, S.
Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
title Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
title_full Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
title_fullStr Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
title_full_unstemmed Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
title_short Optimising the long-term mine waste management and truck schedule in a largescale open pit mine
title_sort optimising the long-term mine waste management and truck schedule in a largescale open pit mine
url http://hdl.handle.net/20.500.11937/12250